Introduction
Infrastructure
C-V2X Roadside Unit
TCROS TC
AI CCTV
Electricity, Cabinet, Communication
Smart Pole
Infrastructure Overview
IPC/RSU/TCROS signal controllers are installed at 19 smart intersections in the second phase; AI CCTV to detect traffic flow is installed at boundary intersections in the second phase; AI CCTV to detect vulnerable pedestrians is installed at bus passing or densely populated intersections .
Construction of roadside and network
例:路口崁頂三路及後洲路一段
- 場域特性:郊區/住宅區(車流量低)
- 情境設計:大眾運輸優先號誌、旅者聯網資訊發佈、交通路況聯網偵測
- 設備布設規劃:號誌控制器、電力、箱體、通訊、網路線(設備箱體至號誌控制器)、RSU、CCTV(車流)
For details of roadside and network construction in the entire site, please refer to the"Danhai Infrastructure list ".